Homepage > News > China > 

Subway Line 4 to start trial operation

2009-09-22 10:08 BJT

Subway Line 4 opens for test run

On May 31, Subway Line 4 started a test run for the first time, marking the existence of all required conditions for operation throughout the line. When Line 4 is put into trial operation before China's National Day on Oct. 1st., the minimal departure interval will be three minutes (the planned minimal departure interval is two minutes). This is to respond to the large passenger flow of over 700,000 every day. Full Story>>

Photo taken on Sept. 21, 2009 shows the platform of Yuanmingyuan Park station on Subway Line 4 in Beijng, capital of China. Construction of the 28.2-kilometer-long Subway Line 4 entered the test phase recently. It will start trial operation before China's National Day on Oct. 1st.(Xinhua)
Photo taken on Sept. 21, 2009 shows the platform of Yuanmingyuan Park station
on Subway Line 4 in Beijng, capital of China. Construction of the 
28.2-kilometer long Subway Line 4 entered the test phase recently. It will 
start trial operation before China's National Day on Oct. 1st.(Xinhua)

Workers cleanse glass door at National Library station on Subway Line 4 in Beijng, capital of China, Sept. 21, 2009. Construction of the 28.2-kilometer-long Subway Line 4 entered the test phase recently. It will start trial operation before China's National Day on Oct. 1st. (Xinhua)
Workers cleanse glass door at National Library station on Subway Line 4 in 
Beijng, capital of China, Sept. 21, 2009. Construction of the 
28.2-kilometer long Subway Line 4 entered the test phase recently. It will 
start trial operation before China's National Day on Oct. 1st. (Xinhua)